Jump to content
×
×

rconaadmin

Admin
  • Content Count

    3,013
  • Donations

    $0.00 
  • Joined

  • Last visited

About rconaadmin

  • Rank
    Administrator

Profile Information

  • Neighborhood Association
    Fiddyment Farm
  • First Name
    Loren
  • Last Name
    Cook
  • Gender
    Male

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Ice House Bridge move to affect Oak Street roundabout traffic Cranes will lift the Rube Nelson Ice House Bridge to its final location between 9 a.m. and 3 p.m. on Thursday, Dec. 20. During the move, a portion of the Oak Street roundabout will be closed. Detour signs will direct traffic around the closed area. View a map and learn more about the Downtown Bridges & Trail Project. Public Works Department 311 Vernon Street, Roseville, CA 95678 (916) 746-1300 | engineering@roseville.ca.us | roseville.ca.us/PublicWorks
  2. rconaadmin

    Trail Alerts & Information

    New trail segment opens in downtown Roseville A new portion of trail is now open between Folsom Road and Lincoln Street. This trail connects the existing Miner's Ravine Trail from Sierra College Boulevard to Royer Park. With next year's completion of the Downtown Bridges & Trail Project, the trail will continue further through Royer Park and on to Darling Way. This will result in a continuous 6-mile off-street trail through Roseville. Free public parking is available in the trailhead lot adjacent to Fire Station 1 on Lincoln Street. More spots are also located in the Vernon Street and Oak Street parking garages. Construction was funded with Transportation Development Act funds. No City of Roseville General Fund money was used on the project. Temporary closure on Pleasant Grove Creek Trail Drainage work has temporarily closed the South Branch of the Pleasant Grove Creek Trail where it passes under Woodcreek Oaks Boulevard. Please choose an alternate route. This trail segment is anticipated to reopen in several weeks. The remainder of the Pleasant Grove Creek Trail remains open. View a map of all trails and bikeways. Dry Creek Greenway EAST: Transportation Commission to consider final environmental report The Dry Creek Greenway East Project will be discussed at the upcoming Transportation Commission meeting. Under consideration is certification of the Project Environmental Impact Report (EIR), selection of the trail alignment in the Riverside Avenue and Sunrise Avenue areas, and project approval. LEARN MORE. Dry Creek Greenway WEST: View feedback from open house and online workshop More than 200 people shared ideas about the Dry Creek Greenway West at the second community open house and online workshop. This valuable feedback is being considered along with other criteria such as creek location, topography, safety, aesthetics, and land use impacts. A draft study that includes preferred trail alternatives will be available for public review in early 2019. LEARN MORE. More Share the Trail signs and pavement markings on Roseville paths Roseville’s trails are a great place for fun and transportation. Please remember to Share the Trail whether you're on foot or on wheels. Similar to other trails in our region, bicyclists keep to the right lane, except when passing. Pedestrians keep to the left lane so they can see oncoming cyclists. Seeing oncoming trail users is especially helpful if you're wearing headphones. In addition to Share the Trail signs, you'll notice new pavement markings showing the travel direction for pedestrians and bicyclists. By following these safety tips, we can all enjoy our more than 35 miles of paths. LEARN MORE. Public Works - Alternative Transportation 316 Vernon Street, Suite 150, Roseville, CA 95678 (916) 774-5293 | transportation@roseville.ca.us | www.roseville.ca.us/bikeways
  3. December Project Update Interstate 80 / Highway 65 Interchange Improvements Watch the video above to learn the latest updates on the Interstate 80 / Highway 65 Interchange Improvements Project We’re making good progress on the Interstate 80 / Highway 65 Interchange Improvement project. While construction will continue through the holidays, businesses along Highway 65 in both Rocklin and Roseville will remain open and accessible for all your shopping needs! Construction crews working on the Interstate 80 / Highway 65 Interchange Improvements Project Improvements to this interchange will provide local and regional travelers better access to the Galleria Mall, Scandinavian Designs, and other businesses, making shopping in the area that much more convenient. “[This project] will also be a tremendous benefit to economic development in our region and to the economy as a whole. It will allow citizens in our area to spend less time sitting in traffic and more time with their families, at their jobs, or wherever else they might like to be,” said State Assemblyman Kevin Kiley. The local economy has already experienced a significant positive economic impact due to the construction project. More than 100 full-time construction workers are dedicated to keeping this project moving along and are at the construction site daily. This benefits our region as these workers are staying in nearby hotels, eating lunch and dinner in local restaurants, and shopping before and after work.  Catch up on the Interstate 80 / Highway 65 Improvements Project by watching our December project update video! Miss past project updates or looking for more information? Visit our website at www.8065interchange.org. Due to limited funding, the overall project will be constructed in phases. While PCTPA and project partners are moving forward on Phase 1, the time needed to complete the overall project could be up to 20 years – or more – depending on available funding. Stay up to date on construction and traffic updates by following @CaltransDist3 on Twitter and Caltrans District 3 on Facebook. This first phase of the Interstate 80 / Highway 65 Interchange Improvements Project will provide a third lane on northbound Highway 65 from Interstate 80 to Pleasant Grove Boulevard and make improvements to the Galleria Boulevard / Stanford Ranch Road interchange. The project is scheduled for completion in 2020. www.8065interchange.org Contact PCTPA at (530) 823-4030 ‌ ‌ ‌ Placer County Transportation Planning Agency | 299 Nevada Street, Auburn, CA 95603
  4. rconaadmin

    Dry Creek Greenway West Project Updates

    Feedback from the online workshop and second open house More than 200 people shared their ideas at the second community open house and through the online workshop. This valuable feedback is being considered along with other criteria such as creek location, topography, safety, aesthetics, and land use impacts. A draft study that includes preferred trail alternatives will be available for public review in early 2019. VIEW A SUMMARY OF FEEDBACK. About Dry Creek Greenway West In collaboration with Placer County and the Rails-to-Trails Conservancy, the City of Roseville is evaluating the possibility of Dry Creek Greenway West, a 3 mile multi-use paved trail between Cook Riolo Road and Riverside Avenue. This potential trail would ultimately connect with the proposed Dry Creek Greenway East (Riverside Avenue to Old Auburn Road), as well as trails west of Cook Riolo Road in unincorporated Placer County. The Dry Creek Greenway is just one of the trails in Roseville and Placer County's bikeway master plans. Funding for this planning and feasibility study is provided by a grants and other transportation-specific funds. LEARN MORE. Public Works - Alternative Transportation 316 Vernon Street, Suite 150, Roseville, CA 95678 (916) 774-5293 | transportation@roseville.ca.us | www.roseville.ca.us/bikeways
  5. rconaadmin

    Santa In The Park

    until
    Saturday, December 8, 2018, at Roseville Sports Center at Mahany Park 1545 Pleasant Grove Blvd Time: 1 - 4:30 p.m. Kids — See Santa’s Arrival on a Roseville Fire Truck at 1:30 PM. Cookies, punch, live entertainment, and crafts — all FREE! Download the flyer here: SITP Flyer 2018 Final.pdf
  6. rconaadmin

    Pancake Breakfast

    until
    Pancake Breakfast Saturday, December 1st 6:30am - 10:30am Fire Station 7, 911 Highland Pointe Dr. Please join us for a free pancake breakfast including hot cakes, sausages, O.J. and coffee Download the flyer here: 2018 Pancake Breakfast.pdf
  7. Version 1.0.0

    0 downloads

    Small Cell (5G) presentation

About Us

The Purpose of RCONA

·         To raise the level of community participation by citizens for improving and maintaining the quality of life within the City of Roseville.

·         To work with neighborhood associations in resolving social, physical and economic problems within a neighborhood, and deal with other important neighborhood issues.

·         To facilitate communications within and between neighborhoods.

·         To provide instruction and support to neighborhood association leader.

·         To pursue funds from all sources for use in the community and neighborhoods.

·         Revitalize inactive neighborhoods.

·         Organize the residents, property owners, organizations and businesses within each area into a neighborhood association.

·         Bring all neighborhoods together in a coalition of associations.

Get In Touch

   1911 Douglas Blvd, Suite 85 - PMB370, Roseville, CA
   Contact Us
   916-248-4878 (voice mail)
×

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.